|
Chilliwack BC Canada | 40 ton loads at 2 loads per hour with 12000 ton to spread will take 12 and a half 12 hour days. Even if you only did 1 load and hour each with 2 spreaders you could be done in 2 weeks easy.
Bossman has 2 of these JBS and we love them. Built locally too!!
Edited by CanadianCowMan 3/11/2024 09:35
(IMG_5836 (full).jpeg)
Attachments ---------------- IMG_5836 (full).jpeg (134KB - 89 downloads)
| |
|